Encore Metals
North Salt Lake City, Utah

OVERVIEW

• Keller Associates personnel served as project engineer
• 35,000 square feet of warehouse and 10,000 square feet of office space
• Design incorporated the use of concrete tilt up walls and steel construction for both lateral and gravity loads
• Warehouse area also includes crane frame design to transport storage and equipment.
• Construction completed 2005

 
         
Bedrock Quartz
Encore Metals
Wild Oats
 
Keller Associates, Inc. © 2008