School Projects
 MOUNTAIN
VIEW HIGH SCHOOL
The project site is located on a 50 acre parcel directly southeast of the
intersection of Locust Grove Road and Overland Road. Keller Associates was
consulted to perform civil engineering services related to development of
the site parking facilities, ball fields, utility main and service extensions,
storm water disposal, irrigation ditch tiling, and public agency coordination.
Specifically, Keller Associates worked closely with the project design team
and construction manager to develop the project plans in two phases. This
strategy allowed the project site improvement plans to proceed with approval
and construction prior to full completion of the building plans.
LINDER ROAD MIDDLE SCHOOL
The Linder Road Middle School consists of construction of a new school building
and associated planned site improvements; including sports fields, parking
facilities, utilities, stormwater disposal, an irrigation pump station design,
and Linder Road improvements. (The site is approximately 38 acres)
 MERIDIAN MIDDLE SCHOOL - LEWIS & CLARK
Keller Associates was responsible for development of grading and drainage
plans, utility plans, and a pressure irrigation pump station
design for the 35-acre Lewis & Clark Middle School site. Keller Associates
performed circulation and turning movement analysis and roadway
plans for the Pine
Street extension. Keller Associates developed a separate bid
package to tile a portion of Settler’s Canal and on-site irrigation
ditches.
 MERIDIAN CHARTER SCHOOL
In coordination with the local architect and governing agencies, Keller Associates
provided off-site civil engineering services for extending water and sewer
service along Locust Grove frontage, irrigation modifications, and widening
of Locust Grove to incorporate a left-turn bay, a deceleration lane, and
sidewalks. Keller Associates independently bid the project and administered
construction of the improvements.
 VALLIVUE HIGH SCHOOL
Keller Associates designed the water-sewer systems for the new Vallivue High
School in Caldwell, Idaho. The new 218,000 square foot high school facility,
situated on 55 acres, included 6- and 8-inch water supply lines and 8-inch
sewer lines. Keller Associates also designed an extension of the City of
Caldwell’s wastewater collection system to connect to the new high
school.
 KUNA HIGH SCHOOL
Keller Associates designed and prepared detailed construction plans for the
new 50 acre Kuna High School site located near Deer Flat Road and Linder
Road. Keller Associates staff was responsible for development of grading
and drainage plans for the school parking facilities, sports playing fields,
building roof drainage, and miscellaneous locations near the school building.
Keller Associates was responsible for design of offsite water and sewer extensions,
intersection widening at Deer Flat and Linder, Deer Flat Road widening, and
the design of Kay Street to provide service to Kuna High School. |