Kuna MBR Wastewater Treatment Plant
 City of Kuna / Kuna, ID |
|
|
Nampa Tank, Booster and Pipeline
 City of Nampa / Nampa, ID |
|
|
Ontario Water Treatment Plant
 City of Ontario / Ontario, OR |
|
|
Burley Well 7, Storage Reservoir & Booster
 City of Burley / Burley, ID |
|
|
|
|
| WATER ENGINEERING |
Project:
Nampa Tank, Booster and Pipeline |
CLIENT / LOCATION City of Nampa / Nampa, ID |
 |
|
|
Rapid growth in the City of Nampa taxed the existing water supply and limited capacity of the City’s only storage--an elevated 500,000 gallon tank. Keller Associates completed master planning, operational theory for three wells, siting, permitting, and designing of a new 3,000,000 gallon tank that will serve south Nampa and eliminate the need for more than two wells.
Cost:
$3,600,000
Services provided:
- 3.0 MG prestressed concrete tank with free spanning dome roof, ladder, manway, and overflow basin
- 8,000 feet of 28-inch HDPE pipe including four canal crossings and construction in state right-of-way
- Reservoir circulation pump station with three 1,200 gpm pumps and sodium hypochlorite (chlorine) disinfection system
- Coordination with Nampa Highway District for construction of tank pad and coordination with local land owners and county officials in siting and permitting
- Funding through DEQ State Revolving Loan Program
- Computer modeling included 24-hour model simulations to optimize system controls for winter and summer operations
|
 |
|
|
|
Prev
1
2
3
4
Next
|
|